Reltic Construction Consultants Independent Commercial Advisory
Services
Project types
Who we work with
Projects Scenarios Insights Process About
Contact 020 3576 2851
A London house being extended, with the owner relying on one person to run it

Category 09

Insights for homeowners

Extensions, loft conversions and refurbishments, from the first conversation about the budget to the day the certificates are handed over.

Where to start with a house extension

Almost everyone starts with the drawings. The two decisions that actually govern the project come before anybody draws anything.

What to prepare for your first project meeting

You need far less than you think. What matters is that what you bring is honest about where the project has actually reached.

Is my house extension budget realistic

The figure in your head came from somewhere. Whether it survives contact with a builder depends on what it was built from.

What to allow for beyond the builder’s quote

The builder’s price is the largest number in a house project. It is not the only one, and the rest are not small.

Do I need an architect, an engineer or both

They are not alternatives. They answer different questions, and most extensions need both answered.

How to coordinate your architect, engineer and builder

Three capable people working to three different versions of the same project is the most common reason a house build stalls.

Building control on a home extension, and who does what

Building regulations approval is a separate consent from planning permission, with a different body, a different process and a different certificate.

Which building control inspections to plan for

The stages are predictable. What catches people out is the notice each one needs and the cost of covering work up before it has been seen.

How to read a builder’s quote

Most homeowners compare quotes on the total at the bottom. That number is the least informative part of the document, because two builders can...

How to spot missing work in a builder’s quote

A quote is as much a statement of what the builder is not doing as of what they are. The gaps are where the extras come from.

What to agree before the builder starts

A house project usually begins with a handshake and a quote. That is enough while everything goes well, and it decides very little once it does not.

How to agree a payment schedule with your builder

Pay for work that is standing on site, in stages you can measure, and never ahead of the building.

Paying for work actually in place

On a house project the money usually moves faster than the building. Each payment feels reasonable on its own, and the gap only becomes visible if...

Should I pay a builder’s deposit

A payment for specific materials already ordered is one thing. A round sum before anybody arrives is another.

My builder is charging for extra work, what should I check

Some extras are genuine and some are work that was always included. The difference is decided by documents, not by tone.

How to agree the price of a change before work starts

Once the work is built, the only question left is how much. Agreeing the figure first is the whole of the discipline.

What does a home renovation project manager actually do

Not design, and not building. The job is the money, the programme and the paperwork between the people who do both.

How to keep a renovation moving while working full time

Jobs do not usually stall for lack of labour. They stall waiting for an answer from somebody who is in a meeting.

How to put together a snagging list before handover

A snagging list closes a job properly. It cannot rescue work that nobody looked at while it was being built.

What to check before the final payment

The last payment is the last leverage. Everything you want from the builder has to be in your hands before it leaves yours.