The work divides into four things: getting the job priced properly before you commit, getting it onto a contract that says what you think it says, checking the money every month against what is actually built, and keeping the programme and the paperwork moving until the certificates are in your hands. That is what home project management for a private client covers. What it does not cover is design, structural calculations or carrying out the building work, each of which belongs to somebody else and stays there.
The reason the role exists on private jobs is structural rather than technical. A developer has a quantity surveyor, a contract administrator and a site manager. A homeowner has an architect who is not on site weekly, a builder with an interest in the answer, and themselves. The gap in the middle is where the money is decided.
Before anything is committed
The first piece of work is testing whether the scheme and the budget are compatible, and saying so in money rather than in encouragement. That happens before design fees are spent, which is the only point at which the answer is cheap to act on. We go through the method in whether your extension budget is realistic.
Then the documents that make a price meaningful: a drawing set with revisions, a specification covering the finishes, and a schedule of the work. With those in place, builders price the same job and the comparison means something. Without them, the lowest number usually belongs to whoever assumed least.
Tendering follows: inviting builders, answering their questions consistently, putting every return on one basis, and recommending one with the reasons stated. The recommendation is only worth having if the person making it has nothing to gain from it, which is why we take no commission or referral fee from builders, architects or suppliers.
Getting the contract right
You hold the contract with the builder. That is deliberate and it does not change: the agreement is between you and them, and a project manager administers it on your behalf rather than becoming a party to it. What that means in practice is that we issue the paperwork, value the work and check the applications, while the contractual relationship stays yours.
Starting from a published form written for private clients is almost always better than an exchange of emails. JCT publishes contracts for home owners, including a version for use where a consultant has been appointed to oversee the work, and those forms already contain a payment mechanism, a change procedure, a defects period and dates.
This also matters because a homeowner’s contract sits outside part of the general construction payment framework. Section 106 of the Housing Grants, Construction and Regeneration Act 1996 takes contracts with a residential occupier outside the statutory payment and adjudication provisions, so your remedies come from the document itself. What to settle in it is in what to agree before the builder starts.
Through the build
Every application for payment is checked against the work standing on site before you release anything, which is a different exercise from reading the invoice. Every change is priced and agreed before it is built, with its effect on the completion date agreed at the same time. The account runs continuously, so the expected final figure is known each month rather than discovered at the end.
Alongside the money sits the coordination: one drawing register, one list of outstanding decisions with dates, the consents on the programme, and the inspection visits lined up with the work. Those are unglamorous and they are what stops a job stalling, as set out in coordinating your architect, engineer and builder.
Then a site meeting each week and a written report, so you know where the job has reached and what is owed by whom. On a job where you are working full time, that report is the mechanism that keeps you in control without being present, which we deal with in keeping a renovation moving while working full time.
What stays with other people
Design stays with the architect or designer. Structural design and calculations stay with the structural engineer. Decisions on compliance and the certificates under the building regulations stay with your building control body, and the charges for that are payable by you directly. Reltic does not design, and is not the Principal Designer or the Principal Contractor under the CDM regulations.
Reltic is also not regulated by the RICS. We say that plainly because the question is reasonable and because a client is entitled to know exactly what they are appointing.
What that leaves is the commercial and management side of the project, which is the part a homeowner is least equipped to do alone and the part where the money is actually won or lost.
What this means for you
The simplest test of whether the role is worth it on your job is the size of the decisions you are being asked to take alone. If you are comparing prices you cannot interrogate, or releasing payments you cannot value, the fee is buying you a different kind of certainty.
You can take the whole sequence or stop after the first stage. A written view on the prices you already hold is a defined piece of work with a fixed fee, and plenty of people use the report to choose a builder and come back only if the job gets difficult.
If you want the whole job run, the fee is agreed as a fixed figure before the work starts and does not move unless you ask for something else, and you are the only person who pays us. The three ways in and what each costs are set out on the home project management page.
Want one person accountable from first price to handover?
Tell us where the project has reached. We will set out what we would take on and what it would cost as a fixed fee.