Reltic Construction Consultants Independent Commercial Advisory
Services
Project types
Who we work with
Projects Scenarios Insights Process About
Contact 020 3576 2851
Quiet British street at dawn with construction cranes on the skyline beyond

About Reltic

An independent seat at the table

Reltic is a UK construction commercial consultancy. We sit between the design team, the client and the contractor without belonging to any of them, and our only output is commercial advice that can be defended.

What we are

A consultancy, nothing else

A commercial consultancy, and deliberately nothing else. Reltic exists to make quantities, cost data and commercial decisions defensible at every stage of a development, from feasibility through to final account.

That is the whole business. We measure, we price, we procure, we control cost through delivery, we settle accounts, and where we are appointed by a lender we monitor. Everything we produce is intended to be handed to a third party who will test it.

The practice is deliberately narrow. Growing into design, into delivery or into software would each be a reasonable commercial decision and each would compromise the one thing clients actually instruct us for.

  1. 01

    Not a main contractor

    We do not build and we do not run a supply chain. No framework, no preferred bidder, no trade relationship that a recommendation might protect.

  2. 02

    Not a design practice

    We do not design and we earn nothing from the scheme developing. There are no drawings of ours to defend when the measure does not match the model.

  3. 03

    Not a software vendor

    We license nothing to you. In practice we work in whatever environment the project already runs on, and no tool is being sold underneath the advice.

The rule

One side per project, in writing

We act for developers and investors on some schemes and for lenders on others. Never for both on the same one, in either order, at any interval.

  1. 01

    Checked first

    Before scope or fee, the scheme is checked against our current and previous appointments. It is the first thing we do, not a formality at the end.

  2. 02

    Declined plainly

    If we are on the other side of the scheme, we decline and say so. No information barriers, no carefully worded arrangement.

  3. 03

    Disclosed openly

    Where we act for a party you are dealing with on a different scheme, you are told before you instruct us rather than afterwards.

  4. 04

    Recorded on every page

    The capacity we act in is printed on the cover and in the footer of every document we issue, so it travels with the document.

  5. 05

    Held for the whole project

    The side does not change part way through because a different instruction becomes available. It holds until the account is settled.

This rule costs us work. It is also the only reason our reports are accepted by the other side of the table.

Why we hold it absolutely

A monitoring surveyor certifying against a cost plan their own firm produced adds nothing to a credit file. A cost consultant advising a developer while quietly hoping for the funder's monitoring instruction is not giving independent advice, whatever the internal arrangements say.

Independence that depends on professional restraint is not independence. It has to be structural, which means turning down the second instruction, and it means saying so openly when we do.

Questions

About the practice.

Who will be working on my project?

A senior commercial lead, named at appointment and accountable for the instruction through to final account. Reltic is a specialist commercial practice rather than a general consultancy, and the work is not passed down to assistants once the fee is agreed. That continuity is the point of the structure: the person who sets the budget is the person who defends it at final account, so nothing is lost in handover.

Do you have professional indemnity insurance?

Yes, to a limit of indemnity of £5,000,000. The policy schedule is sent on request and before you instruct rather than afterwards. Where a scheme or a funder requires a specific level of cover or a particular endorsement, tell us at the outset so it can be dealt with properly.

What does the company name mean legally?

The trading identity is Reltic, Independent Commercial Advisory. The legal entity is Reltic Construction Consultants Ltd, registered in England and Wales under company number 12581120, with its office at 60 Tottenham Court Road, London W1T 2EW. Appointments, insurance and invoices are in the company name.

Do you work outside the UK?

The practice is built around UK measurement standards, UK contract forms and the UK market, so that is where the work is. Enquiries from outside the UK are considered on the specifics rather than turned away automatically, but we will be direct about where our knowledge stops.

Work

Schemes we have worked on

Each scheme is listed by its type, size and stage, and by the commercial problem it presented. We do not name the client, the address or the design team unless every one of them has agreed in writing. See selected projects.