Cost reviews
10
Sets of builders’ prices and cost plans reviewed in the month.
For homeowners
Six questions, mostly tapping. You see what a review costs before you give us your name, and the figure arrives by email.
Two builders can price the same extension and differ by tens of thousands, and most of that gap is not profit. It is work one of them has left out, an allowance that will be adjusted later, or a figure that assumes something nobody has drawn yet.
This page tells you what an independent review of those prices costs, before you give us your name, and sends that figure to you by email.
Fee calculator
October 2026
Cost reviews
10
Sets of builders’ prices and cost plans reviewed in the month.
Work reviewed
£6.6m
The combined value of the building work across those projects.

Prices compared
50+
Builders’ prices put on one basis and checked item by item.
Commission
0%
No commission and no referral fee from any builder, on any job.
Saved for clients
£670k
Saved for those clients over the month, in round figures.
What the review is
A written report you can act on, whether or not you ever come back to us.

We go through every price line by line and put them all on the same footing, so you are comparing the same work rather than two different headline totals.
The exclusions on a domestic quote usually live in the covering email and in short phrases inside the document. We list them, with what each one would cost to put back.
An allowance is a placeholder that will be adjusted to whatever you actually buy. We show you which lines are not yet prices, because those are the ones that move.
The items most likely to arrive later as a variation, named in advance, so you can ask about them before you sign rather than after the wall is open.
Once every price covers the same work, we tell you which ones genuinely sit inside your figure and which only look as if they do.
Our view on the strongest prices and why. We take no commission or referral fee from builders, so there is nothing in it for us whichever one you choose.
What it costs
The fee starts at £1,650 for a project up to £300,000 with up to five prices to compare. Above that it depends on what the work is worth and how many prices there are. You see your own figure in the questions above, before you give us your name.
The figure is confirmed once we have seen the documents. If anything about your job changes it, you hear that before we start, not afterwards. Above £1 million we price the work individually.
The report is with you within seven working days of the deposit. Plenty of people stop there, use it to choose a builder, and come back only if the job gets difficult. If you later want the whole project run, that is home project management and it is quoted separately.
Checking builders’ prices starts at £1,650 for a project up to £300,000 with up to five prices to compare. Above that it depends on what the work is worth and how many prices there are. You see your own figure in the questions on this page before you give us your name.
You put them on one basis. Until every price covers the same work, the totals are not comparable, and the cheapest one is usually the one that leaves the most out. We go through each quote item by item and show you what is missing, what is an allowance rather than a price, and where the extras will come from.
A price is only high or low against what it includes. We measure the work ourselves, build an independent cost plan as the benchmark, and tell you where your quote sits against it. Sometimes the answer is that the price is fair and the scope is wrong.
Yes, and that is the point at which it is worth doing. We also read the contract itself: scope, exclusions, dates, payments, how changes are priced, retention and defects. That is a commercial review, not legal advice, and where something needs a solicitor we say so.
Both. Homeowners come to us with two or three prices for an extension or a refurbishment and no way to tell them apart. You deal with the same people who do the commercial work, and you are not handed to anybody else.
Seven working days from the deposit, with the report in writing. If the documents are thin or the job is unusual we tell you that before we start, not afterwards.
No. We take no commission and no referral fee from any builder, on any job. Our fee is the only money we take, which is why we can tell you plainly what we think of every price in front of you.
The drawings, the specification if there is one, and the quotes with the emails that came with them. If you do not have all of it, send what you have and we will tell you what is missing.

Most homeowners compare quotes on the total at the bottom. That number is the least informative part of the...
Read the guide
A quote is as much a statement of what the builder is not doing as of what they are. The gaps are where the extras...
Read the guide
A house project usually begins with a handshake and a quote. That is enough while everything goes well, and it...
Read the guide