Reltic Construction Consultants Independent Commercial Advisory
Services
Project types
Who we work with
Projects Scenarios Insights Process About
Contact 020 3576 2851
Student accommodation scheme under construction, with modular units being craned into place

Residential development

Seventy two student studios

Seventy two identical rooms and a set of shared spaces that serve all of them. The commercial position depends almost entirely on how tightly the repeated unit is controlled, and on who pays for the parts nobody sleeps in.

The scheme

Seventy two times a small mistake

High density accommodation rewards precision more than almost any other residential type. The studio is designed once and built seventy two times, so an error in the unit cost is an error repeated seventy two times over.

The shared facilities work the other way. They are designed once, built once, and have to be carried by every studio in the building. Where they are not apportioned explicitly, the cost per bed stops meaning anything.

At a glance

The commercial facts

Everything we publish about a scheme, and nothing that identifies anybody.

Scheme
Seventy two self-contained studios with communal and ancillary areas
Location
United Kingdom
Value
£1m to £5m
Stage
Pre-construction
Our role
Cost plan, procurement and bid analysis

Our part in it

What we were asked to do

Price the repeated studio in detail, including the prefabricated elements, so that the multiplier was applied to a number worth multiplying.

Separate the communal and ancillary areas into their own cost centre and apportion them openly, rather than letting them disappear into the rate per bed.

Support the procurement and analyse the tender returns, so that the differences between bidders were visible as scope rather than as price.

The scheme

What a job of this kind looks like

Brick facade and window grid of the completed student accommodation scheme
Completed student study bedroom with fitted kitchenette and desk
Communal dining and social space in the completed student accommodation
Corridor of the completed student accommodation with fire doors to each room
Student accommodation under construction with modular units being craned into position