Residential development
Five three bedroom houses
Five houses on one site, procured under one contract and built at the same time. Small enough that nobody expects a commercial problem, which is exactly why they tend to arrive.
The scheme
Five plots, not identical
Houses on a single site are rarely as repetitive as the drawings suggest. Ground conditions vary across the plots, boundary treatments differ, and the plot at the end always has something the other four do not.
On a scheme of this size there is no room to absorb that. A single unforeseen item spread across five units moves the outturn in a way it would not on fifty.
At a glance
The commercial facts
Everything we publish about a scheme, and nothing that identifies anybody.
Our part in it
What we have done on it
Built the cost plan from measurement rather than from a rate per house, so the differences between plots sat on the face of the document instead of inside an average.
Prepared the tender documentation and reviewed the returns on a common basis, adjusting for the qualifications each contractor attached.
Carried the commercial control through construction, valuing work in place monthly and testing each variation against the contract rather than against the last one.
The scheme
What a job of this kind looks like
More work
Other schemes

Industrial and logistics unit
New industrial and logistics facility with external works
See the project
Seventy two studios, student accommodation
Seventy two self-contained studios with communal and ancillary areas
See the project
Six storey residential, three blocks
Three blocks of six storeys, repeated flat types over the upper floors
See the projectWorking on something similar?
Tell us what the scheme is and where it has reached. If it is not work we should take, we will say so and point you somewhere sensible.