ref.jpg

Refurbishment

Do You Already Have Architectural Plans ?

Refurbishment

Is your property in need of a make-over? We are a well-established building company with many years experience in property renovations.

We have the expertise to assist you with every aspect of any renovation work, from the inception of your idea, through to the design, planning, construction, finishing and installation of any appliances.

Reltic have worked on many properties in London, developing and renovating homes.

We offer comprehensive building services, providing many types of house renovation including complete home refurbishment, extensions and conversions.

Professional Builders In London

Having completed a wide range of successful renovation projects, our expert team work to an extremely high standard, creating beautiful end results.

​​

Whether it is a brand new kitchen or conservatory, Reltic offer extremely high levels of workmanship, providing you with a first-class service.

Home Renovation & Design

We can provide a full design and planning service, ensuring your property renovation is up-to-date with the latest building regulations and will submit any plans which are in need of approval. Our design team can advise you on the creative use of space, using their experience to help save you money whilst achieving your goals.

​​

Our builders can renovate anything in your property, including the replacement of ceilings, re-plastering walls, re-decorating and even replacing your windows and doors. You may even wish to update your kitchen or bathroom, in which case, we offer both bathroom and kitchen refurbishment. We can also knock down any dividing walls to create more living space and bring more natural light into your home.

Make Your House Renovation A Reality

  • Removing / remodelling load bearing walls

  • Structural repairs

  • Temporary roof structures and roof repair

  • Replacement and installation of chimneys

  • Internal alterations, extensions and conversions

  • Stripping out

  • Any electrical, plumbing and heating installations

  • Plastering, tiling, painting and decorating

  • Basement work

Home Refurbishment

It can be far more cost-effective to renovate and refurbish your property, rather than move, with our expert house and property renovation services in London. Over time, our homes can suffer wear and tear and it only requires a little bit of home refurbishment work from Reltic to get your property looking brand new.

​​​​

If you need your property renovating, and would like to arrange a consultation, fill in our quick online contact form and we will call you to arrange a convenient time to talk.

Dedicated Project Managers

Your project manager will help and guide you throughout the whole building process. This includes discussing architectural plans, obtaining relevant planning permission and assembling the right team and maintaining quality control.

​​

From initial conception to completion, Reltic will ensure you receive an exceptional service – whatever the size of your property renovations. We also provide full after sales care and support.

Contact  Reltic today if you’re looking for a professional building company to complete your property renovation in London.

Let's Connect

Whether you need a simple valuation or a full structural survey as well as being expert building surveyors we’re happy to give you free, impartial advice on anything to do with buildings and property

Address

85 Great Portland Street | London, W1W 7LT

Email

Phone

0207 630 2881

  • Facebook
  • Twitter
  • Instagram

Contact Us

Reltic © 2020  - All Rights Reserved. Reltic is a trading style of 

My Project Estimating Ltd