Reltic Bills of Quantities

Bills Of Quantities

We produce accurate and detailed Bills of Quantities for private clients and main contractors tendering on projects to assist them in submitting competitive tenders for their projects

Estimates start at £90.00.

Express service
24/48 hour turnaround

7-Day Standard Estimates

Bills of Quantities

At Reltic, we pride ourselves as Specialists in Bills of Quantities Production, it is our livelihood. We have, and still produce Bills of Quantities for the top building contractors in the UK. Contracts range in value from individual trade packages to £ 20M Projects complete.

We produce our bills in accordance with the Standard Method of Measurement (SMM7) and the New Rules of Measurement (NRM2), however, the majority of our clients favour the former.

Utilising the latest software from a sole construction software provider, Cost Adviser Professional everything we do on our on-screen take-off, BQ Production, Earthworks measurement, etc. works together harmoniously, as one.  We can issue our bills both electronically and/or hard copy format upon request. Electronic formats include ConQuest, CITE, Excel and PDF. We do take an active interest in BIM and other building modeling software which can offer us the facility to measure from models, which can provide us with efficient check quantities.

With a growing client base at our fingertips, we can act as an independent administrator for locating other Contractors who may wish to participate in a Bill Share between the other tendering Contractors depending on the procuring Client’s approval and the boundaries of Best Professional Practice. If all parties agree, Reltic will undertake and administer all Bill Share arrangements, all parties will be allocated a share of the costs and invoiced accordingly. Reltic will even serve the individual party’s personal bill requirements during the tender period on a separate basis.

As Specialists in BQ Production, we are naturally proficient in offering other services attributed to measurement and quantity surveying. We can produce quantities for any contract situation, including Cost Plans, Detailed Builders Quantities, Cut and Fill / or Earthworks modelling, and independent/impartial quantity checks Post Contract. Take a look at our case studies page to see the services we have to offer.

Choosing Reltic to produce your quantities will give you peace of mind that comes from our pro-active, reliable, personable and dependable approach.

  • The dedicated team of professionals

  • Accurate, efficient & cost-effective measurement and billing

  • Bills of Quantities issued in a format to suit

  • Cost Plans

  • Detailed Builders Quantities

  • Earthworks Measurement

  • Flexible, Reliable Bill Production

  • Attending Design Team meetings and/or site visits if required

  • Incorporating tender addendums and value engineering as required

  • High-quality BQ’s meeting strict deadlines

  • Independent/Impartial quantity checks

  • Comprehensive and easy to navigate BQ’s

  • Post Production services to respond to queries and post tender changes

  • Transparent service, dim sheets and digitisation sheets (mark-ups) issued upon request

  • Expert and Professional advice to minimise risk

Our estimation process

  • The estimation process at Reltic starts with a formal meeting of estimators to discuss and identify the scope of work. This also includes the allocation of tasks to trade specialist estimators.

  • Then after reviewing the project documents and specifications provided by the client, the trade specialised estimators import the plans using the latest software and measure the dimensions and scales by the point and click method to digitally takeoff the quantities.

  • After performing the on-screen takeoffs, all the material quantities are exported to EXCEL spreadsheets. 

  • Our connections with local contractors and merchants help with accurate postcode based pricing for material and labour rates which are categorised in the current Price Book.

  • Finally, a cross-check is performed by the lead estimator for the quality assurance and quality control of the project deliverables.

Many Contractors, Developers, Architects, And Owners Trust Us For Reliable And Timely Commercial Estimating Services, We Hope You Will Too!

Reltic Construction Consultants
  • Facebook
  • LinkedIn